top of page

Complete Water-Saving Basin Systems for Schools | Ready-to-Install Packages

School washroom facilities require basin installations that minimize water waste, withstand constant student use, and keep maintenance costs under control. Our Cobra complete basin packages combine water-saving demand-action taps with durable vitreous china basins and all necessary fittings—delivering up to 60% water savings while eliminating the risk of taps left running in unsupervised student washrooms.


Why Schools Choose Cobra Demand-Action Basin Systems

Educational facilities face unique challenges: students often leave taps running, vandalism is common, and water bills spiral out of control. Cobra demand-action basin systems solve these problems:

  • Automatic shut-off – eliminates water waste from taps left running

  • 60% water savings – proven reduction vs. standard taps

  • Vandal-resistant design – students cannot jam taps open

  • Budget-friendly ROI – payback within 18-24 months

  • Complete installation kits – all components supplied


Complete Cobra School Basin Package Components

Vitreous China Washbasin

Cobra 709300WH Wall-Hung BasinSKU: 709300WH | ZAR 894.41

Compact, durable wall-hung basin specifically designed for high-traffic school washrooms. The space-saving design maximizes student capacity while the vitreous china construction withstands years of heavy use.

Basin Specifications:

  • Material: High-grade vitreous china

  • Mounting: Wall-hung (brackets required separately)

  • Finish: White gloss easy-clean surface

  • Tap holes: Single central hole (suitable for demand-action valve)

  • Overflow: Integrated overflow channel

  • Dimensions: Compact design for multi-basin installations

School-Specific Benefits:Wall-hung design – simplifies floor cleaning and maintenance✓ Stain-resistant vitreous china – maintains appearance despite heavy use✓ Impact-resistant construction – withstands accidental knocks✓ Easy-clean gloss finish – speeds up daily cleaning routines✓ Standard waste fitting – 1¼" compatible with Cobra waste systems

Ideal Applications:

  • Primary school cloakrooms and washrooms

  • Secondary school toilet block facilities

  • Sports changing room wash areas

  • School cafeteria handwashing stations


Water-Saving Demand-Action Tap

Cobra KM2-100/N Demand-Action Basin ValveSKU: KM2-100/N | ZAR 1,978.44

Revolutionary water-saving tap system that delivers a pre-set volume of water per activation, then automatically shuts off. This eliminates the single biggest cause of water waste in schools: taps left running.

How Demand-Action Technology Works:

  1. Student presses button/lever

  2. Water flows for pre-set duration (typically 5-8 seconds)

  3. Valve automatically closes

  4. Student can re-activate if more water needed

Water-Saving Performance:

  • Standard tap left running: 12-15 litres/minute

  • Demand valve per activation: 1-1.5 litres total

  • Typical handwash usage: 1-2 activations (2-3 litres total)

  • Water savings vs. standard taps: Up to 60-70%

Key Features for Schools:

  • Self-closing mechanism – impossible to leave running

  • Vandal-resistant construction – chrome-plated brass body

  • Adjustable flow duration – customize per facility needs

  • Temperature mixing – can be pre-set to safe warm temperature

  • Servicing access – quick cartridge replacement

  • No hold-open design – students cannot jam valve open

Annual Water Savings (Per Basin):

  • Student handwashes per day: 150 uses

  • Standard tap waste: ~1,800 litres/day (assuming half left running)

  • Demand valve consumption: ~300 litres/day

  • Daily savings: 1,500 litres

  • Annual savings: ~400,000 litres per basin

  • Cost savings: ~ZAR 9,200/year per basin


Chrome-Plated Basin Waste

Cobra 303/N Slotted Basin Waste (Without Chain)SKU: 303/N | ZAR 114.92Connection: 1¼" chrome-plated brass

Essential drainage component for basin installation. The slotted design works with basin overflow systems, while the chain-free design prevents vandalism and choking hazards in school environments.

Waste Features:

  • Slotted design – integrates with basin overflow

  • No chain or plug – eliminates vandalism and safety risks

  • 1¼" BSP connection – standard waste pipe compatibility

  • Chrome-plated brass – corrosion-resistant finish

  • Removable grate – allows maintenance access for blockages

Why Chain-Free Design for Schools:Safety compliance – no choking hazard from loose chains✓ Vandalism prevention – nothing to remove or damage✓ Lower maintenance – no lost plugs to replace✓ Hygiene improvement – continuous drainage, no standing water✓ Cost savings – eliminates chain/plug replacement costs


Flexible Connection Hoses

Cobra C-15/350 Flexi Connection HoseSKU: C-15/350 | ZAR 103.96Specifications: ½" BSP × 350mm length

Flexible braided hose for connecting water supply to tap. The flexible design accommodates slight misalignments and simplifies installation, reducing labor costs.

Connection Benefits:

  • Flexible installation – compensates for pipework variations

  • Braided stainless steel – burst-resistant, long service life

  • ½" BSP fittings – standard connection size

  • 350mm length – suitable for most basin installations

  • Quick-connect design – reduces installation time


Wall Brackets (Mounting Hardware)

Cobra 232-10/NV Basin Wall BracketsSKU: 232-10/NV | ZAR 68.22

Heavy-duty wall brackets for secure basin mounting. The NV (Non-Vandal) specification indicates reinforced construction suitable for institutional environments.

Bracket Specifications:

  • Heavy-duty steel construction – supports basin weight plus user pressure

  • Powder-coated finish – corrosion protection

  • Concealed fixing design – tamper-resistant installation

  • Adjustable mounting – accommodates slight wall irregularities

  • Pair supplied – complete mounting set


Complete School Basin Installation Package

Package Includes:

  1. Cobra 709300WH Wall-Hung Basin – vitreous china washbasin

  2. Cobra KM2-100/N Demand-Action Valve – water-saving self-closing tap

  3. Cobra 303/N Slotted Waste – chain-free drainage system

  4. Cobra C-15/350 Flexi Hose – supply connection

  5. Cobra 232-10/NV Wall Brackets – mounting hardware (pair)

Complete Package Price:

ZAR 3,159.95 (saves ZAR 200+ vs. purchasing separately)

What's NOT Included (Required Separately):

  • Waste trap and pipework

  • Hot/cold water supply pipework

  • Wall fixings and rawl plugs

  • Installation labor


Water Savings & Return on Investment

Financial Analysis (Per Basin Installation):

Initial Investment:

  • Complete basin package: ZAR 3,160

  • Installation labor: ~ZAR 800

  • Total investment: ZAR 3,960

Annual Operational Savings:

  • Water consumption savings: ~400,000 litres

  • Municipal water/sewerage charges: ~ZAR 9,200/year

  • Maintenance cost reduction: ~ZAR 500/year

  • Total annual savings: ZAR 9,700

Return on Investment:

  • Payback period: 4.9 months

  • 5-year savings: ZAR 48,500

  • 10-year savings: ZAR 97,000

School-Wide Implementation Example:

20-Basin Installation (Typical Primary School):

  • Total investment: ZAR 79,200

  • Annual water savings: 8,000,000 litres

  • Annual cost savings: ZAR 184,000

  • Payback period: 5.2 months

  • ROI after 3 years: 596%


Installation Specifications for Schools

Recommended Basin Layout:

Primary Schools (Ages 5-11):

  • Basin rim height: 750-800mm from finished floor

  • Basin spacing: Minimum 700mm centers

  • Ratio: 1 basin per 30 students

Secondary Schools (Ages 12-18):

  • Basin rim height: 800-850mm from finished floor

  • Basin spacing: Minimum 750mm centers

  • Ratio: 1 basin per 40 students

Accessibility Requirements:

  • At least 1 basin per 10 units at 750mm height (wheelchair access)

  • Clear approach space: 900mm minimum

  • Lever-operated taps for accessible basins


Maintenance & Durability

Maintenance Schedule:

Weekly:

  • Visual inspection of tap operation

  • Check for leaks around waste connections

  • Clean basin surfaces with standard cleaners

Monthly:

  • Test demand valve activation and duration

  • Clear any debris from waste grates

  • Check wall bracket security

Quarterly:

  • Service demand valve cartridge

  • Inspect flexible hoses for wear

  • Deep clean overflow channels

Annually:

  • Replace valve cartridge if needed (cost: ~ZAR 150)

  • Check all connections for corrosion

  • Re-seal basin-to-wall joints if required

Expected Service Life:

  • Vitreous china basin: 15-20+ years

  • Demand-action valve: 8-10 years (with cartridge replacements)

  • Chrome waste: 10-15 years

  • Flexible hoses: 5-8 years

  • Wall brackets: 20+ years


Installation Support & Bulk Pricing

Volume Discounts Available:

QuantityPrice Per PackageTotal Savings1-4 unitsZAR 3,160Standard5-9 unitsZAR 3,000Save 5%10-19 unitsZAR 2,850Save 10%20+ unitsContact for quoteSave 15%+

Gundo Evolution School Support:

Technical specifications for tender documentation✓ Site assessments and layout planning✓ Water savings calculations for budget justification✓ Phased delivery to match school holiday schedules✓ Installation training for maintenance staff✓ Replacement parts stocking for quick repairs


Environmental & Educational Benefits

Beyond cost savings, demand-action basin systems support:

  • Water conservation education – students learn sustainable practices

  • Environmental responsibility – demonstrable commitment to water saving

  • DBE sustainability goals – aligns with national education initiatives

  • Community leadership – schools set example for water stewardship


Order Complete School Basin Systems Today

Transform your school's washroom facilities with proven water-saving technology that pays for itself in months while teaching students responsible water use.


Ready to eliminate water waste and reduce costs?

Contact our education facilities team for complete quotations, water savings calculations, and installation scheduling during school holidays.

 
 
 

Recent Posts

See All

Comments


gundo evolution logo 2

Gundo Evolution is a local Sales and Distributor of Sanitaryware Industrial Products. We have partnered with both Local & International manufacturers with Reputable brands.
Read More...

Head Office:
St Andrews Office Park, 39 Wordsworth Ave, St Andrews, Germiston, South Africa

Pick up Station 1 :

39 Wordsworth Ave, Germiston,

2007,

South Africa

Pick up Station 2 :

Unit 10, Plantation Centre,

40 Plantation Road, Ottery,

Cape Town

7808

+27(0) 11 738 9923

© Copyright 2025 Gundo Evolution​. Developed and Designed by Mfundopedia

bottom of page